MiMo-V2.6 Pro 1.02T-A42B on Mac mini M4 Pro 64 GB

1.0T (42B active) on 64 GB at 273 GB/s. Hardware details · Model details

No calculated fit. MiMo-V2.6 Pro 1.02T-A42B does not fit under standard overhead assumptions at MLX 4-bit: the model calculates 576.7 GB required against 54.4 GB usable.
CompatibilityDoes not fit
Calculated fit
No
Calculated Requires more than 97% of usable memory. Needs a smaller quantization or more memory.
Smallest catalogued quantization
MLX 4-bit
Calculated mlx
Memory required
576.7 GB
Calculated of 54.4 GB usable — 1060%
Max practical context
0
Calculated model supports 1M

Memory budget at 8K context

Model weights
555.7 GB Calculated
KV cache
3.3 GB Calculated
Runtime overhead
17.7 GB Estimated
Total required
576.7 GB Calculated
Headroom
-522.3 GB Calculated
No quantization in our catalogue fits this machine.
Unified memory: weights, KV cache and the OS share the same 64 GB pool. We assume 85% is addressable by the GPU, which matches a headless machine with the wired-memory limit raised.
Mixture of experts: all 1020B parameters must be resident in memory even though only ~42B are active per token. Memory follows total parameters; speed follows active parameters.
Performance

Estimated performance · recommended MLX 4-bit

Decode, prefill and TTFT below are estimates for MLX 4-bit. We do not have a comparable MLX 4-bit measurement on this machine.

Estimated decode
Estimated MLX 4-bit; calculated range
Estimated prefill
Estimated MLX 4-bit; calculated range
Estimated TTFT at 8K
~671.5–1388.6 s
Estimated MLX 4-bit; calculated range
Hardware load reference
62 W
Measured machine-level load; not this model run
No throughput figures for this configuration. We do not estimate performance for a model that cannot load.
How the estimate is calculated
  1. Decode: reading 42.0B active parameters at 4.50 bits/weight takes 123.63 ms at 273 GB/s x 70% achieved efficiency.
  2. MoE routing penalty of 15% applied: expert gathers are less bandwidth-efficient than a dense sweep.
  3. Prefill: 17 TFLOPS (FP16) x 22% assumed model-FLOPs utilisation, divided by 2 x 207.0B parameters per token.
  4. Prefill uses 207.0B effective parameters, not the 42B active in decode: a batch of hundreds of tokens routes across most of the expert pool.

  • MoE decode depends on how well the engine batches expert gathers; real results vary more than for dense models.
  • Prefill throughput is highly engine-dependent. Flash attention, batch size and quantized KV all move this number substantially, and for sparse mixture-of-experts models it is the least reliable figure we produce.
  • This is a calculated estimate, not a measurement. It assumes a single request, a short prompt, no speculative decoding and a warm model already resident in memory.

Estimator version estimator_v1. Stored with every estimated row so old estimates can be regenerated when the model improves.

Submit a benchmarkSubmissions stay pending until reviewed.
This model at other quantizations on this machine
QuantizationResidentDiskTotal neededUtilisationFitMax context
MLX 4-bitsmallest listed555.7 GB555.7 GB576.7 GB1060%Does not fit0
Q4_K_M593.2 GB593.2 GB615.3 GB1131%Does not fit0
Q5_K_M695.9 GB695.9 GB721.1 GB1326%Does not fit0
Q8_01029.5 GB1029.5 GB1064.7 GB1957%Does not fit0
Cost of running MiMo-V2.6 Pro 1.02T-A42B on this machineUnited States (federal) · C corporation · 8h/day
Monthly economic cost
$24
Calculated after tax
Codex/Claude Code
$100/mo
≈ $100/mo · local is $76 less
Net cash at purchase
$2,251
Calculated VAT not reclaimable
Total over 5 years
$1,414
Calculated after tax, after resale
Cost per USD/1M tokens
Calculated

The $100 comparison uses the Codex Pro 5x / Claude Max 5x plans. A fixed planning conversion is used for USD. This compares monthly spend only: subscriptions have usage limits, local hardware has different capabilities and constraints, and taxes or regional pricing may change the charged amount. Prices checked 7 September 2026.

Purchase-price input: $2,251 in United States (federal), tax/VAT excluded · estimated · Apple Store NL (converted catalogue estimate). This is the localized purchase input; the after-tax economic cost is calculated separately below.

Monthly breakdown

Depreciation
1,576 over 5 years, straight-line to a 675 residual
$26.26
Electricity
2.7 kWh/month at 0.140/kWh
$0.38
Cost of capital
4.0%/yr on 1,463 average capital employed
$4.88
Monthly cost before tax$31.53
Electricity tax shield
Running costs are deductible business expenses
−$0.08
First-year expensing
§179 (100.0%)
−$7.88
Monthly economic cost after tax$23.57

Three different numbers, deliberately

Cash cost
$2,251
Money that leaves the bank account on day one, net of reclaimable VAT.
Accounting depreciation
$26.26/month
$1,576 written down over 5 years to a $675 residual.
After-tax economic cost
$23.57/month
Depreciation plus running costs plus cost of capital, less the tax those deductions save. This is the figure to compare between machines.
Assumptions and sources (verified 2026-09-07)
VAT rate
0% Official spec
VAT recoverable
0% Official spec
Federal C-corporation estimate at the flat 21% rate. Pass-through entities should use the sole-proprietor estimate as a rougher proxy.
Effective deduction rate
21.00% Calculated
Headline marginal rate 21.00%.
Depreciation
5 years, straight-line Assumption
Residual value
$675 (30%) Assumption
Extrapolated from the three-year curve.
Electricity
$0.140/kWh Assumption
Average power draw
16 W Calculated
Load 62 W for 20% of powered hours, idle 4 W for the rest — a machine that is on is not generating tokens the whole time.
Investment allowances
§179 100.0% Official spec
Worth $473 in total — first-year expensing that replaces later tax depreciation.
Cost of capital
$4.88/month Assumption
Federal planning estimate only, not tax advice. State and local income tax, sales/use tax and incentives are excluded. It assumes 100% business use, a Section 179 election, enough business income to use it, and that the full annual limit remains available.