Ternary Bonsai 2 27B on RTX 3090 workstation (Ryzen 9 7950X, 64 GB)

27.36B on 24 GB at 936 GB/s. Hardware details · Model details

Run locally →
Yes. Ternary Bonsai 2 27B fits on RTX 3090 workstation (Ryzen 9 7950X, 64 GB) at the recommended PTQ1_0 configuration, requiring approximately 7.2 GB at 8K context. Practical context capacity is 192K.
CompatibilityComfortable
Calculated fit
Yes
Calculated Uses under 80% of usable memory. Room for a long context and other work.
Recommended quantization
PTQ1_0
Calculated gguf
Memory required
7.2 GB
Calculated of 22.1 GB usable — 33%
Max practical context
192K
Calculated model supports 256K

Memory budget at 8K context

Model weights
5.5 GB Measured
KV cache
0.5 GB Calculated
Runtime overhead
1.2 GB Estimated
Total required
7.2 GB Calculated
Headroom
14.9 GB Calculated
Smallest published ternary pack that leaves headroom: uses 33% of usable memory at 8K context.
Discrete GPU: 24 GB of VRAM, of which we assume 92% is usable after driver and context overhead.
Hybrid attention: token-growing KV memory is charged to 16 full-attention blocks. The linear-attention blocks also hold fixed-size state, so the memory estimate is approximate.
Performance

Estimated performance · recommended PTQ1_0

Decode, prefill and TTFT below are estimates for PTQ1_0. We do not have a comparable PTQ1_0 measurement on this machine.

Estimated decode
Estimated PTQ1_0; calculated range
Estimated prefill
Estimated PTQ1_0; calculated range
Estimated TTFT at 8K
~7.4–15.3 s
Estimated PTQ1_0; calculated range
Hardware load reference
600 W
Official spec hardware TDP; not this model run
No throughput figures for this configuration. We do not estimate performance for a model that cannot load.
How the estimate is calculated
  1. Decode: reading 27.4B active parameters at 1.75 bits/weight takes 8.53 ms at 936 GB/s x 75% achieved efficiency.
  2. Prefill: 142 TFLOPS (FP16) x 32% assumed model-FLOPs utilisation, divided by 2 x 27.4B parameters per token.

  • Prefill throughput is highly engine-dependent. Flash attention, batch size and quantized KV all move this number substantially, and for sparse mixture-of-experts models it is the least reliable figure we produce.
  • This is a calculated estimate, not a measurement. It assumes a single request, a short prompt, no speculative decoding and a warm model already resident in memory.

Estimator version estimator_v1. Stored with every estimated row so old estimates can be regenerated when the model improves.

Submit a benchmarkSubmissions stay pending until reviewed.
This model at other quantizations on this machine
QuantizationResidentDiskTotal neededUtilisationFitMax context
PTQ1_0recommended5.5 GB5.5 GB7.2 GB33%Comfortable192K
PQ2_06.7 GB6.7 GB8.4 GB38%Comfortable192K
Cost of running Ternary Bonsai 2 27B on this machineUnited States (federal) · C corporation · 8h/day
Monthly economic cost
$26
Calculated after tax
Codex/Claude Code
$100/mo
≈ $100/mo · local is $74 less
Net cash at purchase
$1,981
Calculated VAT not reclaimable
Total over 5 years
$1,578
Calculated after tax, after resale
Cost per USD/1M tokens
Calculated

The $100 comparison uses the Codex Pro 5x / Claude Max 5x plans. A fixed planning conversion is used for USD. This compares monthly spend only: subscriptions have usage limits, local hardware has different capabilities and constraints, and taxes or regional pricing may change the charged amount. Prices checked 7 September 2026.

Purchase-price input: $1,981 in United States (federal), tax/VAT excluded · estimated · Used market exact-match reference (converted catalogue estimate). This is the localized purchase input; the after-tax economic cost is calculated separately below.

Monthly breakdown

Depreciation
1,545 over 5 years, straight-line to a 436 residual
$25.75
Electricity
31.3 kWh/month at 0.140/kWh
$4.38
Cost of capital
4.0%/yr on 1,208 average capital employed
$4.03
Monthly cost before tax$34.16
Electricity tax shield
Running costs are deductible business expenses
−$0.92
First-year expensing
§179 (100.0%)
−$6.93
Monthly economic cost after tax$26.30

Three different numbers, deliberately

Cash cost
$1,981
Money that leaves the bank account on day one, net of reclaimable VAT.
Accounting depreciation
$25.75/month
$1,545 written down over 5 years to a $436 residual.
After-tax economic cost
$26.30/month
Depreciation plus running costs plus cost of capital, less the tax those deductions save. This is the figure to compare between machines.
Assumptions and sources (verified 2026-09-07)
VAT rate
0% Official spec
VAT recoverable
0% Official spec
Federal C-corporation estimate at the flat 21% rate. Pass-through entities should use the sole-proprietor estimate as a rougher proxy.
Effective deduction rate
21.00% Calculated
Headline marginal rate 21.00%.
Depreciation
5 years, straight-line Assumption
Residual value
$436 (22%) Assumption
Extrapolated.
Electricity
$0.140/kWh Assumption
Average power draw
178 W Calculated
Load 600 W for 20% of powered hours, idle 72 W for the rest — a machine that is on is not generating tokens the whole time.
Investment allowances
§179 100.0% Official spec
Worth $416 in total — first-year expensing that replaces later tax depreciation.
Cost of capital
$4.03/month Assumption
Federal planning estimate only, not tax advice. State and local income tax, sales/use tax and incentives are excluded. It assumes 100% business use, a Section 179 election, enough business income to use it, and that the full annual limit remains available.